 |
The FOEN system at Worthington Steel, Delta, Ohio (1997). |
 |
The FOEN system installed at Pro Tec Coating Company, Leipsic, Ohio, USA (1993). |
 |
The FOEN air knives viewed from above the snout. |
 |
The FOEN knife positioners that control height, skew, and scan movements. |
 |
The FOEN system installed at DNN, Windsor, Ontario, Canada (1993). |
 |
The FOEN preheating furnace used to heat the sink, stabilizing, and correcting roll submerged parts. |
 |
The FOEN system installed at Hoesch, Ferndorf, Germany (1975). |
 |
A typical FOEN coating trend from our system at the Pro Tec #1 line. |
 |
The FOEN sink roll setup stand, air knife setup stand, air knife site stands, and lifting beam in the maintenance area. |
 |
The FOEN system installed at Krupp Stahl, Bochum, Germany (1992). |
 |
An example of a typical FOEN coating profile. |
 |
The FOEN system installed at Sumitomo Metal Ind., Wakayama, Japan (1987). |